I downloaded, installed, and registered the free Mentor Maker design environment today. It took me a while to figure out how to use PartsQuest to select parts and import into Maker Schematic entry. But… I downloaded five parts; one of them, an MMBT3904 transistor, worked fine, with both a symbol and a footprint… another part, BSP225, downloaded with a footprint… but the symbol was just a rectangle. Three other parts, all of them microcontrollers from Silicon Labs, gave me NO symbol or footprint… just a rectangle. Obviously, this design environment would be relatively useless without both t
| Parameter | Value / Range |
|---|---|
| Core Architecture | — (Contact for datasheet) |
| CPU Speed (MHz) | — (Contact for datasheet) |
| Flash Memory (KB/MB) | — (Contact for datasheet) |
| RAM (KB) | — (Contact for datasheet) |
| I/O Pins | — (Contact for datasheet) |
| Communication Interfaces | — (Contact for datasheet) |
| Package | — (Contact for datasheet) |
| Operating Temperature | — (Contact for datasheet) |
Please refer to the official datasheet for complete specifications.
IoT edge nodes, motor control, home appliance, industrial PLC, wearable devices
Current supply conditions for Microcontroller from TI: extended lead times of 20–30 weeks expected for high-demand variants. ODK maintains buffer inventory for select critical part numbers — contact us for real-time stock check.
ODK Electronics keeps inventory on a broad range of TI Microcontroller components. That includes standard production parts, selected EOL items still in circulation, and a few specialty grades that larger distributors don't prioritize.
We ship globally. Turnaround from quote to delivery is typically 5–12 business days for in-stock items. If you're working with a BOM that has a few hard-to-source items on it, that's exactly the kind of thing we handle well. Send us a list.
Contact sales | BOM Kitting Service | Urgent Sourcing
Reference: DigiKey Tech Forum — March 29, 2026